Project Overview

Project Name:

SG EOT Crane

Capacity:

3 Tonnes

Duration:

3 Months

Date:

4 July 2025

Location:

ISRO, Mahendragiri

Client:

ISRO

Project Cost:

₹22 Lakhs

This project involved the design, manufacturing, and commissioning of a 3 Ton Single Girder EOT Crane for ISRO at Mahendragiri. The system was developed to meet precision handling requirements in a high-performance and sensitive operational environment.

Completed within 3 months, the project focused on reliability, smooth operation, and strict adherence to safety and quality standards required for critical applications.

Key features

The crane system was engineered to ensure accuracy, controlled movement, and consistent performance under specialized operational conditions.

Precision Handling

Designed for accurate and controlled lifting operations.

Reliable Performance

Ensures consistent operation in critical industrial environments.

Safety Compliance

Built with advanced safety features and tested before commissioning.

Project execution process

A systematic process was followed to meet strict technical and operational requirements.

01

Requirement Analysis

Detailed study of application-specific handling requirements.

02

Engineering & Fabrication

Precision manufacturing with strict quality control standards.

03

Installation & Testing

On-site installation, load testing, and commissioning.

Challenges & solutions

The project required precision handling with strict quality and safety compliance.

Project Challenges:

High Precision Requirement:

Need for accurate and controlled operations.

Strict Standards:

Compliance with high-level safety and quality norms.

Operational Reliability:

Ensuring uninterrupted performance in critical conditions.

Solutions Provided:

Precision Engineering:

Designed for smooth and accurate load handling.

Quality Assurance:

Strict testing and inspection at every stage.

Reliable System Design:

Ensured long-term durability and performance.

Project FAQs

A 3 Ton Single Girder EOT Crane was installed.

The project was executed for ISRO at Mahendragiri.

The project duration was 3 months.

Yes, we deliver crane solutions for precision and critical industrial applications.